bolt Nepal Electricity Authority (NEA)
NEA Electricity Tariff
Consumer tariff schedule from Nepal Electricity Authority — residential slab rates (single-phase 230V), bill estimator, other consumer categories, and selected service charges.
table_chart Residential — single phase 230V
| Slab | Consumption band | Minimum charge | Energy rate |
|---|
Bill = minimum charge for the highest slab reached + energy charge for each slab band consumed (per NEA worked examples in the official tariff).
calculate Monthly bill calculator
electric_bolt
Enter units and ampere rating to estimate your bill.
business Other consumers — low voltage (230/400V)
| Category | Demand (Rs/kVA/mo) | Energy (Rs/unit) |
|---|---|---|
| Industrial — cottage & home industry | Rs 60 | Rs 7.80 |
| Industrial — general | Rs 110 | Rs 9.60 |
| Commercial | Rs 325 | Rs 11.20 |
| Non-commercial | Rs 215 | Rs 12.00 |
| Irrigation | — | Rs 2.25 |
| Drinking water — community | — | Rs 4.20 |
| Drinking water — other | Rs 160 | Rs 7.20 |
| Transport — public (incl. trolley bus) | Rs 200 | Rs 5.75 |
| Transport — other | Rs 220 | Rs 8.90 |
| Religious place | — | Rs 6.10 |
| Street light — with meter | — | Rs 7.30 |
| Street light — without meter | Rs 2,475 | Rs 0.00 |
| Temporary connection | — | Rs 19.80 |
| Non-residential domestic | Rs 350 | Rs 13.00 |
| Amusement business | Rs 350 | Rs 14.00 |
electrical_services Selected service charges
| Service | Fee (Rs) |
|---|---|
| Application form — domestic | Rs 100 |
| Application form — other | Rs 200 |
| Fuse service — single phase | Rs 100 |
| Fuse service — three phase | Rs 200 |
| New connection — 5A domestic | Rs 100 |
| New connection — 15A domestic | Rs 150 |
| New connection — 30A domestic | Rs 300 |
| New connection — 60A domestic | Rs 500 |
| New connection — three phase | Rs 1,000 |
| Line cut | Rs 250 |
| Line reconnect | Rs 500 |
info
Rates are taken from the official NEA consumer tariff document (residential section 1.1).
Three-phase seasonal demand charges, time-of-day (TOD) rates, and discounts are not included in the residential calculator.
Confirm final bills with your local NEA distribution office.